Jurisdiction: Scotland. This guide combines the legal framework of Scotland with local information for Dundee. The relevant address, activity and decision determine which local references apply.
The legal framework
Scottish energy projects combine Great Britain market regulation with Scottish land, planning and environmental requirements. Ofgem licensing or an applicable exemption concerns regulated activities, while Scottish Ministers or planning authorities may determine development consent depending on the project. Applications under sections 36 and 37 of the Electricity Act have their own procedure and publicity requirements, administered through the Energy Consents Unit where relevant. A grid offer, land option or supply agreement does not itself establish that the project has all permissions needed for construction or operation.
The legal programme should connect site control, access, cable routes, grid conditions, funding and the consent timetable. Scottish title burdens, servitudes and security arrangements can affect project bankability and the ability to transfer an interest. Environmental assessment, peat, habitats, water and landscape issues may require technical evidence and consultation. Contracts should allocate responsibility for design, delays, curtailment, performance and decommissioning, without promising that a regulator will grant approval. For a project acquisition, check the identity of each rights holder and any transfer or change-of-control conditions.
Operational disputes can involve construction defects, power purchase terms, metering, service interruption or the allocation of market risk. The agreement may provide adjudication, arbitration or another mechanism, with Scottish court procedure relevant to support or enforcement. Preserve technical data and the version of the contractual assumptions used in pricing or investment decisions. A practical review should distinguish a commercial loss caused by market movement from a breach by a counterparty. Legal coordination should keep the regulatory, property and contractual workstreams aligned so the client understands which risks are resolved, which require evidence and which remain conditions to investment.
The Dundee context
Environmental and place-based considerations
The River Tay and Dundee’s waterfront make location-specific environmental investigation relevant to some transactions and projects. Proximity to water alone does not establish a flood designation or development prohibition. Check official mapping, planning conditions and the appropriate environmental regulator. Construction noise, waste handling and industrial discharge may each involve different evidence, permits and enforcement responsibilities requiring a separate assessment.
Local points to investigate
- Check the site, activity and responsible regulator.
- Retain surveys, monitoring records and permit conditions.
- Distinguish a complaint from an appeal or enforcement response.
Authority and procedural context
Dundee City Council. Principal authority for Dundee city; neighbouring Angus and Perth and Kinross areas have separate councils.
Check the current SCTS directory, case allocation and filing instructions. A city address does not establish jurisdiction or guarantee that a particular proceeding will be heard locally.
Check the local court reference ↗
Laws & official sources
Scottish Government — energy consent procedure
Current guidance explains applications, consultation and publicity for relevant Scottish energy consents.
Read the source ↗Ofgem — energy licensing and exemptions
Explains licensing of relevant electricity and gas activities, transfers and the need to establish any exemption.
Read the source ↗Government — electricity licence exemptions
Identifies the statutory exemption framework and distinguishes class and individual exemptions from licensing.
Read the source ↗SEPA — environmental authorisation public register
Identifies the EASR framework for water, waste and industrial authorisations from November 2025 and access to records.
Read the source ↗Preparing your matter
- Map the consent route and regulated energy activities.
- Align land, grid, finance and construction milestones.
- Review environmental conditions and decommissioning responsibilities.
Documents that can help
- Project structure, licences and connection terms
- Land rights, consents and environmental material
- Supply, finance, construction and operating agreements
Questions clients ask
Does an Ofgem licence authorise construction in Scotland?
No. The relevant Scottish development, land and environmental approvals must also be established.
How can Jurisiti assist with your Dundee matter?
The first step is to identify the issue, locations, documents and any deadline. Jurisiti can coordinate research, drafting and matter preparation with appropriately authorised professionals. Availability, authority to act, conflicts, scope and fees are confirmed before an engagement begins.